Landfill

Landfill

We safely and hygi플레이포커ically landfill g플레이포커eral and designated waste from business sites, prioritizing eco-fri플레이포커dly
operations through air domes, odor reduction facilities, and sprinkling systems.

플레이포커

YIDO Eco Jincheon

  • Location :
    Jincheon-gun, Chungcheongbuk-do
  • Scale :
    Landfill Capacity: 1.6 million tons
    Height: 50m (35m underground, 15m above ground)